Explosion-proof valve installation requirements

Working conditions

1. Pressure range: -10kPa~+20kPa

2. Temperature range: -20 ° C ~ 395 ° C

Edit this section of the installation site

Boiler body that is prone to implosion and on the front flue of the precipitator

Installation requirements

1. Installation of explosion-proof valve can be installed at any angle

2. The installation position between the two explosion-proof valves is at least 200mm apart.