February 22, 2025

"Plywood rib" method welding correction excavation maneuvering arm bushing

Home>Bearing knowledge>"Plywood solid rib" method welding correction excavation maneuvering arm bushing
/*728*90 created on 2018/5/16*/ var cpro_id = "u3440131";

"Plywood rib" method welding correction excavation maneuvering arm bushing

Source: China Bearing Network Time: 2014-06-25

/*250*250 was created on 2017/12/25*/ var cpro_id = 'u3171089';
A W4-60 excavator; because the boom reversed too much during the unloading process; the arm movement lost and stabilized; the bottom of the boom was torn at the bottom; the stop was caused. To this end; we adopted the "sandwich" "The law will strengthen its welding.
First use the "hole drilling by light" method to open. Notice; to remove the boom; it is necessary to withdraw the pin. The traditional method of opening is; first lift the driving room; then exit the slightly axis; this is a waste Time is not safe; more can not quickly repair. It is useful to use the "drilling by light" method to open; that is, drill a hole with a diameter of 16mm in the driving part of the positive pin (the hole is close to the margin of the pin; Plug in the iron bridge to pull out the pin; also facilitate the alignment of the axis and the hole when the device is installed. In the field or field conditions; you can also cut a small hole by gas cutting; this method can save time compared with the traditional method 80 %; and safe and reliable.
Then use the "plywood solid rib" method to weld the correction. First use the oxygen-acetylene flame to heat the place to be welded; use a press to proofread; and sort out the external oil and dirt. Use E5016 low hydrogen potassium type electrode; the core diameter is 3. 2mm ; DC reverse connection; current is 100A. First spot welding front; then spot welding the opposite side; final welding side; to reduce deformation. After the completion of welding; remove the welding slag, check the weld forming condition. Then use the angle grinder Some of the welded parts are flattened; it is easy to be reinforced by the board. Two sets of iron plates with a standard of 300mm×100mm×10mm are used for “plywood ribs”; the side faces are reinforced with iron plates of standard 150mm×100mm×10mm; Adjust the welding current to 110A; lap joint; adjust the welding rod to 45 degrees; straight line; one-time forming; then remove the welding slag.
Finally, the "moving car stepping" method is used. Lift the end of the welded boom with a crane, loader or excavator; start the excavator to be repaired together (focus on docking the inlet and return pipes; to avoid oil leakage) Stepping; aligning the base pin hole with the boom sleeve hole; lowering the boom. View the alignment of the boom pin sleeve hole and the base pin hole through the small hole punched in the driving room; then slowly knock the pin shaft The hole is set in the hole; that is, the device is completed. This lifting is not only the component is lightened and safe; the device is more convenient and efficient.

Recommend to friends comments close window

Bearing related knowledge
How to carry out scraping of sliding bearings to avoid burning of diesel bearings?
SKF bearing temperature detection
SKF bearing application considerations Motor bearing grease functional requirements


This article links to http://
Please indicate the bearing network http://

Previous: Correct use of rolling bearings and common problems (1)
Next: Influence of Oscillation Wear and Temperature on IKO Bearings and Countermeasures

Ball Valve

ZHEJIANG HESHUO TECHNOLOGY CO.,LTD , https://www.hosuocn.com