>>>Links: Several issues to be noted when signing a renovation contract First, verify the name and qualification of the decoration company Second, carefully fill in each space on the contract Third, the contract payment IV. Annex to the contract Decoration contract entrance decoration restaurant decoration home decoration decoration decoration decoration decoration company okay Neon Led Strips,Neon Led Lamp Strips,Bathroom Lighting Neon Strips,Gulf Lighting Neon Strips Top Lighting International (HK) Co., Limited , https://www.topled-group.com
1. To see whether it has home improvement construction qualifications, whether it is a member of the Home Improvement Association
2. Check whether the company name and the name on the contract are the same
3, to knock on the special seal of the decoration company headquarters, not chapter chapter
1. Be sure to specify the person in charge of the site of Party B (requirements are the management personnel of the decoration company rather than the contractor)
2. Relative to Party B, Party A is in a weak position. Therefore, Party B’s compensation for breach of contract must be higher, Party A’s needs to be lower.
3, the more content of other agreements, the better, such as
A. No smoke and no open fire at the construction site
B. Garbage must be cleared to the designated location of the property
C. The materials purchased by Party A shall be carried by Party B without compensation.
D. Party B shall not suspend work for any reason except Party A cannot make timely payment.
E. All change items are settled at the time of final settlement
F. The utility bill is paid by Party B
G. All changes shall be in writing, signed by both parties, and verbal notices shall be invalid.
H. Party B shall not change the construction personnel, etc., without the consent of Party A.
1, as far as possible the use of self-determined way, because the use of standard forms of the contract, the initiative to be mastered by the decoration company, according to the general home improvement project, decoration company less than 7 days can get 65% of the project, this time may Woodworkers have not yet entered the venue and the actual costs incurred are less than 5,000 yuan.
2, try to fight for 5% of the warranty paid after one year, so that the warranty is basically guaranteed.
1, this is a very important content, we must let the decoration company seriously fill in, do not be afraid of trouble
2. The main material quotation is the most important part. The material name, unit price, quantity, brand and grade must be filled in in detail. Once there is an economic dispute, this is evidence. 5. Some additional clauses
1. Regarding the settlement according to the actual amount, it is calculated according to the actual quantity of the project rather than the actual usage of the material.
2, electricians should have electrician admission card
3. Party A’s losses are caused by Party B’s failure to timely handle various documents.
4. After the completion of the project, Party B must provide the water and electricity as-built drawings. Party A will sign and accept the settlement after completion of the project.
5. Party B will bear the costs of rework because of the use of materials that do not conform to the contract. Party B will bear the costs, and Party A will retain the right to deal with the issues in accordance with the "Consumer Protection Law."
6. Party B must provide the project schedule and Party A's procurement material schedule before starting construction and strictly implement it.