Screwdriver Types,Offset Screwdriver,Mobile Screwdriver,Magnetic Screwdriver henan horn tools co.,ltd. , https://www.nbhorntoolsltd.com
1, to determine the location of drilling: the use of tape + pen shower room must be fixed, the method is generally fixed using screws, aluminum wall frame on the top of the hole has been set aside, to do is to mark the corresponding location of the wall. The method is to put the frame on the wall, the tape measure to ensure the correct position, and then mark the wall with a pencil.
2. Punching: Using Impact Drilling Step 1: After setting a good position, the next step is to drill holes. There are also two steps to punching holes. First, use a hole drill with a circular drill to drill shallow holes in the mark on the wall.
Construction Tips: Because the bathroom wall has been covered with wall tiles, it is hard. To make drilling easier, you can wet the drill bit. In addition, you can splash water while drilling.
Step 2: After the prototype mark hole is drilled, the next step is to use a more powerful spiral drill bit. Deeper holes are drilled on the already shallower holes.
3, the installation of rubber particles: the use of hand hammer before screwing into the wall before the screws, the first need to install expansion rubber particles in the hole, rubber particles can better tighten the screws. Use a hand hammer to knock the pellets into the drill hole.
4, fixed frame: After using the electric screwdriver to do the above steps, you can install the shower room border, the bottom frame on the retaining bar, and then fixed frame. The method is to use an electric screwdriver to screw the screws into the wall to fix the frame.
Shower frame fixing method
The first step in the installation of the shower room is to find and punch holes, followed by a fixed frame. There are many tools needed to find and punch, and the operation is complicated. Take a look at how the installer is doing this step.