The decoration details are full of acceptance of timely completion of hydropower

After the completion of the hydropower tile, timely inspection and acceptance should be carried out. Once problems arise, they should be rectified in time to avoid affecting subsequent construction. Here's a summary of the issues that arise during the acceptance process and give suggestions for your use.

1, the wire did not do the path test, the line tube without marking.

The inspector recommends: If the wires in the house have been laid. However, the wires in the wire box are entangled and there is no clear identification; the path test should be conducted after the line is laid. If the test is to be completed after most of the housing renovation is completed, it will be difficult to solve the problem if it is found.

Owners should require the plumber to make a clear identification of the line so that he can refurbish it later.

2. The kitchen switch shall be located outside the door opening side. It shall not be located in the bathroom or may be in direct contact with water or a damp place.

The inspector recommends: If the switch of the house's bathroom is placed in the bathroom, this is not in line with the habits of people using the lights on-off-close-off. The correct method should be to install the switch outside the open side of the door. The switch placement of the kitchen is correct. It is worth mentioning that since the house has already been tiled, the bathroom switch must be removed if it wants to change its position. This will cause some loss. Therefore, hydropower acceptance must be timely.

3, gas line is longer, it should add triangle valve

The home inspector suggested that due to the problem of construction, the gas pipeline would be dragged longer because of the need to take into account the use of stoves and gas water heaters in the later period. The inspector recommends adding a triangular valve to the gas meter to prevent the leakage of the line.

Summary: It is recommended that the majority of owners in the renovation of the house, the acceptance of the hydropower pipeline must be timely, it is best to conduct an acceptance at the end of the stage, once the problem can be easily rectified. If you wait until other parts start re-acceptance, problems may easily result in rework and material damage.

Water and electricity acceptance entrance decoration children's room decoration switch house house decoration gas water heater bathroom tile bathroom door kitchen tile

Self-Drilling Screws

Self Drilling Screws,stainless steel self drilling screws,wafer head self drilling screws,hilti self drilling screws

Jiangsu Minglu Stainless steel Co.,ltd , https://www.jsminglubolt.com