The eight steps of decorating the house order make you clear the house decoration

I believe most people have no experience in the first decoration. After all, in addition to the relevant industry personnel, other people's contact with the decoration is rare. There are many things we need to understand in the decoration, such as price, material selection, process and so on. Many people put their energies on the price and material selection. In fact , the order of decorating the house is also very important. The following Xiaobian will introduce the process of decoration in the following.

The order of renovation of the house I. Demolition and reconstruction of the main body

The demolition of the main body is the first project in the renovation, mainly including the demolition of walls, walls, shovels, removal of heating, change of plastic windows, and so on. The garbage that has been demolished must be cleared out in time to ensure the cleanliness of the interior and it is also more convenient for future construction.

The order of renovation of the house II. Circuit reconstruction of the waterway

Before the hydropower reform, the cabinet designer should come to the door to make the first measurement, help determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc., and formulate transformation plans. The water heater is also best to send someone to design the location of the power supply and the interface according to your chosen model. The air conditioner and its power source should be placed on the wall of the bedside as much as possible to prevent the air conditioner from blowing directly to people.

Renovation house order three, wallpaper

The wallpaper is much better than the wall paint effect. After the wall paint is brushed, the oil trader can brush the base paint at the place where the wallpaper is needed. Generally, the next day can dry it, and then the wallpaper can be attached.

Decorate the order of the house IV. Install the socket panel

Socket panel can be installed for about half a day, it should be noted that the best buy socket with switch function, especially the kitchen, this design allows rice cookers, microwave ovens to avoid plugging power, with the switch to control.

Renovation of the order of the house five, installation cabinets

The cabinets are a cooperating project and should be purchased in advance. Range hoods, stoves and sinks should be purchased in advance. It is best to send them on the same day and install them together with the cabinets.

Order to decorate the house VI. Install the finished door

Finished doors should be installed before the floor, mainly because of the complex installation steps, hinges, door locks, door stoppers, door frames, and so on. Many tools are used. If the floor studs are installed first, it is inevitable that there will be bumps.

Renovation of the order of the house seven, installation of hardware

It is recommended that before the installation of the floor, the debris items that are scattered in the drying racks, curtain rods, lamps, sanitary ware, and sanitary ware during installation should be installed. If the procedures are reversed, it is likely to cause wear and damage to the floor.

Renovation of the order of the house eight, install the floor

The floor must be leveled before installation, but also to clean the ground, avoid water cleaning. The cutting of the floor is better not to be in the house. You should cut it in the hallway so that you can clean the hallway.

Editing summary: The above is about the order of renovation of the house , after reading it is not more understanding of the decoration? I hope that Xiao Bian’s sharing can help everyone. More decoration information, please pay attention to this site.

House decoration house decoration note