1. The standard procedures for wall tile paving are: grassroots floor cleaning → ground floor ash → brick selection → infiltration → row bricks → bouncing line → paste standard points → paste wall tiles → hooking → scuffing → cleaning.

2, wall tiles, stone varieties, specifications, colors and patterns should meet the design, households requirements.

3, before the use of wall tiles, we must carefully check the size of the wall tiles (length, width, diagonal, flatness), color, type, and the color number of each piece to prevent mixing and other mixed grades.

4, the grassroots clean-up, such as the wall is the coating base, must be removed after the water spray paint clean, and the cutting depth of not less than 5mm, spacing is not greater than 5cm, and brush the cement slurry 1 times. In addition, all types of dirt on the wall should be cleaned and watered and moistened one day in advance. For example, when the grass-roots level is a new wall, when the cement mortar is 70% dry, bricks, bullets, and tiles must be placed.

5. Check the flatness and verticality of the grass-roots level. If the error exceeds 2cm (check with a 2-meter ruler), use a 1:3 cement mortar to make a leveling before proceeding to the next process.

6. Before the construction, brush the net slurry on the wall again. Before the wall tiles are used, the bricks shall be fully soaked and moistened so as not to bubble. Take out and dry them for use.

7. Determine the typesetting of the wall tiles, and arrange them in a vertical and horizontal arrangement on the same wall. The non-complete bricks should be arranged at the secondary site or the female corner. Tiles with a width and height of 10 cm or less cannot be placed on the wall. The wall tiles should be divided, that is, on the two sides of the wall, the bricks should not be maintained at the same time to maintain the appearance. High-grade matching bricks require five-edge seams (that is, on the basis of four-edge seams, wall tiles and floor tiles are also required to be seamed).

8, the use of cement cement manufacturers, cement mortar volume ratio is generally 1:2.5-1:3, bonding thickness 8-15mm.

9, wood for the partition wall tile, should first hang on the wooden base stencil, brush the net slurry again, plastering the base layer and then paste the wall.

10, before the wall tiles paste must be accurate horizontal and vertical control lines, good bottom (pay attention to the elevation and location of the floor drain, the bottom must be placed level, secure), paste the line, so that the surface is flat, paste should be bottom-up To proceed, complete or separate parts must be completed on the same day, or leave the connector at the corner.

11, before the belt tiles in the paste, to check whether the dimensions and the size of the wall tiles to coordinate with each other.

12. During the process of wall tiles inlaying, the mortar between the brick seams must be full and no emptying is allowed. Damaged corner defect tiles must be replaced. After the uppermost layer of the wall tile is plastered, apply cement mortar to fill the upper void to prevent cracking of the wall tile when the ceiling of the buckle plate is drilled.

13, the bottom layer of wall tiles, should be left until the end of subsidies for tiles. When you purchase the wall tiles for the second time, you must bring bricks and choose the bricks of the same color.

14, the wall tiles and washbasin, bath and other contacts, according to need, can be installed in the washstand, bathtub can be subsidized.

15. When the wall tiles are affixed, the switch panel is used to cut the holes of the cutting machine, and the boring holes shall be tight. Meet the outlet pipe of the water pipe in the middle of the wall tile. The wall tile must not be disconnected. Apply a glass drill bit to cover the brick. Do not use a non-whole tile collage. This will not affect the personal safety during the installation or inspection. At the junction with the door and window, the edge of the door should cover the gap as much as possible.

16. Use dry white cement and talcum powder to clean joints within 1 hour after wall tiles are laid. After the inspection and acceptance, the joints shall be cleaned once and wetted with white cement and talcum powder to clean the joints.

17. Pay attention to product protection to prevent surface contamination and bruising.

Tile Renovation Construction Knowledge Masonry Project Acceptance Cement Paint Glass Switch Home Improvement Decoration Partition Glass Brick Art Glass Kitchen Wall Tile Partition Door Glass Door Kitchen Glass Sliding Door Kitchen Bathroom Ceiling Bathroom Tile Toilet Door Bathroom Tile Color Bathroom Wall Tile Toilet Door Size Bathroom Size Bathroom Design Toilet Waterproof Bathroom Tiles Kitchen Tile Tiles Specifications

PH Meter

Here you can find the related products in PH Meter, we are professional manufacturer of Ph Meter,Ph Tester,Ph EC meter,Ph Analyzer. We focused on international export product development, production and sales. We have improved quality control processes of pH meter to ensure each export qualified product.
If you want to know more about the products in PH Meter, please click the product details to view parameters, models, pictures, prices and other information about Ph Meter,Ph Tester,Ph Ec Meter,Ph Analyzer.
Whatever you are a group or individual, we will do our best to provide you with accurate and comprehensive message about PH Meter!

Ph Meter,Ph Tester,Ph Ec Meter,Ph Analyzer

Xi'an Gavin Electronic Technology Co., Ltd , https://www.gaimcmeas.com