February 22, 2025

What is the key to new house acceptance

With their own houses, people will spend more or less on the money and make up for the family. This is a few thousand dollars, as many as several ten thousand or even hundreds of thousands of yuan to spend decoration costs, the most worrying is the quality, and consumers how to control the quality of decoration and acceptance?
The method that people usually adopt is to personally stare at the site so that problems can be solved in time. In fact, if it is an outsider in the decoration, even if it is soaked in the construction site every day, problems cannot be seen. For those who suffer from lack of time, "staring at the site" is even more unrealistic.
If consumers can grasp the progress during the renovation process and carry out inspections in stages, they can avoid the pain of going around and control the quality of construction.
Check before acceptance to see whether the demolished and reformed project is in accordance with the contract, whether there are hidden safety hazards, whether the wall surface treatment is clean, and whether the quantity, grade, and specifications of the incoming material are in agreement with those agreed in advance.
The acceptance of the second stage of acceptance of the water circuit should be a single acceptance of the waterway and circuit transformation. Consumers should check whether all the transformation lines are unobstructed, whether the layout is reasonable, the operation is normative, and re-operate under the professional hydraulic or electrician operation. Confirm the actual size of the circuit modification. Only after the line is changed, the putty worker can continue to seal the wall and putty.
According to the drawings, the acceptance of the carpentry work size shall be completed after the third acceptance of the carpentry foundation. At this time, ceilings and plaster lines in the room shall also be completed, and the kitchen and bathroom wall tiles shall have been attached. The painted wall should be scraped twice. Acceptance work at this stage is very important, consumers should carefully check the drawings, confirm the size of the various parts, if found inconsistent place, promptly prompt the construction team to modify.
Carpentry job quality acceptance When all the fine wood products are decorated with decorative panels, after the wood line is nailed, consumers can carry out the fourth phase of acceptance. This time is basically half of the time, the inspection of this stage should focus on the color and texture of wood products and large areas of flatness and gaps are uniform.
After the completion of wood products, oil workers can start the primer treatment work, and all floor tiles should also be posted in this stage, which is the fifth stage in the phased acceptance.
The acceptance of the final stage of acceptance after completion is the most comprehensive and thorough. Consumers are required to check the installation of footboards, sanitary ware and hardware, whether the finish of wooden products is in place, whether the paint on the wall or top surface is uniform, whether the panel of the electrician is properly installed and the position of the light fixture, and whether the circuit connection is correct. In addition, consumers should require the construction team to clean the room thoroughly before moving back.
Acceptance stage is not absolute in the actual construction, different families have different requirements for decoration content, construction progress will naturally have corresponding adjustments, consumers can be flexible according to the progress of the project.

Entrance decoration decoration company paint room home decoration house decoration paint bathroom ceiling material bathroom ceiling bathroom floor tile bathroom size

Sealing Film

Product Features
1. The product is easy to open and close, which can effectively seal deep well plates, sample tubes, etc., which is convenient for operation and saves time.
2. Good airtightness can prevent the volatilization of various solvents.
3. Tolerate a wide temperature range, suitable for various experiments.
4. Resistant to chemical corrosion and used for low-temperature storage.

5. The pre-opened silica gel lid allows the Pipette tip or probe to enter the hole without damaging the lid.

6. After the third party inspection, no RNA/DNA enzyme contamination
7. It can be used on automated machines, and the product size conforms to the SBS standard
8. It can be used with stickers, silica gel, and sealed without leakage. 96 round-hole silica gel and 8-hole silica gel strip with matching sealing plate
9. Good flatness, can be transported long distance after sealing with heat sealing film
10. The products are produced and packaged in a 100,000-class dust-free workshop, and the product quality is stable
11. Alphabetical sorting and cut corner marking make the storage and collection of samples more convenient and faster.
12. Each package has an independent article number and batch number identification, which is convenient for quality tracking and traceability


Film Seals,Sealing Film For PCR Plates,Sealing Film QPCR,96 Well Plate Sealing Film,Silicone Sealing Mat

Yong Yue Medical Technology(Kunshan) Co.,Ltd , https://www.yongyue-tube.com