In the blink of an eye, the weather has begun to cool down, and the refreshing bathroom can still be maintained, but the warm bathroom furnishings must accumulate slowly. The installation of Yuba is the first to bear the brunt. Nowadays, most of the bathroom decoration is presented in the form of integrated ceiling. The integrated ceiling installation bath is different from the previous ones. The detailed installation process is how to make Xiaobian come to you. 1, the installation of the corner line The installation strip should be installed flat and firm, determine the installation height, and draw a horizontal line. After the tiles are properly placed, in the horizontal situation, the matching corner lines of the ceiling are integrated and tightly fixed on the tiles, so that there is no obvious gap. 2, the installation of the keel The lower boom and the light steel keel are placed, and the distance between the boom and the keel is the same as the panel size. Open the expansion eye at the top and fix all the booms. Connect the lower bottom of the boom to the hook. Then fix the main dragon skeleton in the middle of the hook and adjust the height nut so that the plane of the main keel is 3cm away from the plane line on the edge strip. And fastened. 3, the installation of the keel According to the actual installation length minus 5mm, take the required keel, put on the triangular hanging piece, and temporarily suspend all the keel with the triangular hanging piece on the main keel according to the drawings. 4, the installation of the gusset Wear clean gloves and install the gussets to take into account the overall aesthetics and bilateral symmetry. Cutting method: Fix the template, use the utility knife and ruler to describe it more than three times, cut the edge with a scissors to cut it into a 90 degree angle, and fold it by hand 2-3 times. The corresponding surface of the template cutting opening is stuck in the keel, the cutting surface is placed on the edge strip, and the edge strip is pulled out to clamp the template. At this time, the triangular lifting piece can be clamped with the steel tongs and the main keel. . When the middle part template is installed, the two corresponding faces of the template are respectively stuck in the keel, and the gap between the templates is controlled to maintain the straight line of the seam. Note: After completing the installation of each row of templates, the triangular lifting pieces should be clamped with the steel tongs and the main keel. 5, the installation of the host When designing the installation position of the heating type host according to the drawing, replace the template with the main panel to confirm the accurate installation position of the main unit; then place the main unit on the top of the keel. Install (embed) the electrical appliance, and make the panel and electrical interface flat and seamless. 6, the top line and mouth panel At the top of the line, determine where to install the luminaire, where to install the kitchen and bathroom appliances, and arrange the line in advance. Buckle panel, this link is directly related to the overall effect of the ceiling. Not only should it be leveled, but it should be straight. SHAOXING ZHENGHONG AUTO PARTS CO.LTD , https://www.kontinental-bearing.com