November 19, 2024

Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube

Model NO.: 2011
Outer Diameter: 2.5mm-250mm or as Your Required
Wall Thickness: 0.3mm-40mm or as Your Required
Inspection: ISO, SGS, BV and So on.
Delivery: 7-25days Oraccording to The Product
Surface: Powder Coated,Anodized,Mill Finished,Polished
Trademark: YingGui
Transport Package: Conventional Packing
Specification: Routine
Origin: China
HS Code: 7609000000
Model NO.: 2011
Outer Diameter: 2.5mm-250mm or as Your Required
Wall Thickness: 0.3mm-40mm or as Your Required
Inspection: ISO, SGS, BV and So on.
Delivery: 7-25days Oraccording to The Product
Surface: Powder Coated,Anodized,Mill Finished,Polished
Trademark: YingGui
Transport Package: Conventional Packing
Specification: Routine
Origin: China
HS Code: 7609000000
Product Description:
 
Product Name Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube
Material Aluminum Tube/Aluminum Alloy Tube
Shape Round, Square, Rectangular, Oval, Hexagonal
Temper O,T4,T6,H14,H24,H116,etc.
Grade 1000 Series:1050/1060/1100/1145/1199/1350
2000 Series:2011/2014/2017/2024/2036/2048/2124/2218/2219/2319/2618/
             2A01/2A02 /2A06/2A10/2A11/2A12/2A14/2A16/2A17/2A50/2A60/2A70/2A80/2A90
3000 Series:3003/3004/3105/3A21
5000 Series:5005/5050/5052/5056/5083/5086/5154/5182/5252/5254/5356/5454/5456/5457/5652/5657/5A02/5A03/5A05 /5A06/5A12/
6000 Series:6005 /6009/6010/6061/6063/6066/6070/6101/6151/6201/6205/6262/6351/6463/6A02
7000 Series:7005/7039/7049/7050/7072/7075/7175 /7178 /7475/7A04 
Size Thickness:0.15-4.5mm or as your required
Outer Diameter:2.5mm-250mm or as your required
Wall Thickness:0.3mm-40mm or as your required
Surface Drawing, Polishing, Anodizing  Coating
Standard GB/T6893-2000,GB/T4437-2000,ASTM B210,ASTM B241,ASTM B234,JIS H4080-2006,etc
Technique Hot rolled,cold rolled,forging,casting,etc.
Inspection ISO,SGS,BV and so on.
Tolearnce 0.15-3.0mm(Thickness Tolerance:+/-0.02mm)
Application Aluminum tube is widely used in all walks of life, such as: automobile, ship, aerospace, aviation, electronics, agricultural and mechanical and electrical, home, etc
Packaging 1. cases packed in wooden cases
2. paper packaging
3. plastic packing
4. foam packaging
Packaging according to customer requirements or products
Delivery 7-25days orAccording to the product
Payment  L/C,D/A,D/P,T/T,Western Union,MoneyGram,According to customer requirements payments for offline orders.

Product Show:
Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube

Factory Show: 

Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube


Detection Equipment:

Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube

Certificate show:
 Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube


Customer Visit:

Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube


Contact Us:

 Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube


FAQ:

Q1:How long time is the shortest delivery?
A1:For stock material,the delivery time is just 3-5 working days.
      And for customized product,it will takes 25-35 working days based on different size and quantity.
Q2:Can you supply the sample?Does it free or not?
A2:For partial materials,we can supply the sample free(without the freight charge).
      If you want to know more details,please contact our sales online.
Q3:What's the terms of payment?
A3:We can accept T/T,100% irrevocable LC at sight,Western Union,etc,
Q4:How to ensure the quality?
A4: We can supply QC,such as MTC,SGS, UT Certificate,etc.
       Besides,we have Trade Assurance Amount from Alibaba Group.
       If our quality is unapproved,we need and will refund full payment to customers
Q4.How can we get your price ?
We need below information to quote for you:
1. Product Name
2. Standard
3. Material Grade (Chemical Composition)
4. Dimension
5. Quantity
6. The Drawing for Special Parts
Product Description:
 
Product Name Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube
Material Aluminum Tube/Aluminum Alloy Tube
Shape Round, Square, Rectangular, Oval, Hexagonal
Temper O,T4,T6,H14,H24,H116,etc.
Grade 1000 Series:1050/1060/1100/1145/1199/1350
2000 Series:2011/2014/2017/2024/2036/2048/2124/2218/2219/2319/2618/
             2A01/2A02 /2A06/2A10/2A11/2A12/2A14/2A16/2A17/2A50/2A60/2A70/2A80/2A90
3000 Series:3003/3004/3105/3A21
5000 Series:5005/5050/5052/5056/5083/5086/5154/5182/5252/5254/5356/5454/5456/5457/5652/5657/5A02/5A03/5A05 /5A06/5A12/
6000 Series:6005 /6009/6010/6061/6063/6066/6070/6101/6151/6201/6205/6262/6351/6463/6A02
7000 Series:7005/7039/7049/7050/7072/7075/7175 /7178 /7475/7A04 
Size Thickness:0.15-4.5mm or as your required
Outer Diameter:2.5mm-250mm or as your required
Wall Thickness:0.3mm-40mm or as your required
Surface Drawing, Polishing, Anodizing  Coating
Standard GB/T6893-2000,GB/T4437-2000,ASTM B210,ASTM B241,ASTM B234,JIS H4080-2006,etc
Technique Hot rolled,cold rolled,forging,casting,etc.
Inspection ISO,SGS,BV and so on.
Tolearnce 0.15-3.0mm(Thickness Tolerance:+/-0.02mm)
Application Aluminum tube is widely used in all walks of life, such as: automobile, ship, aerospace, aviation, electronics, agricultural and mechanical and electrical, home, etc
Packaging 1. cases packed in wooden cases
2. paper packaging
3. plastic packing
4. foam packaging
Packaging according to customer requirements or products
Delivery 7-25days orAccording to the product
Payment  L/C,D/A,D/P,T/T,Western Union,MoneyGram,According to customer requirements payments for offline orders.

Product Show:
Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube

Factory Show: 

Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube


Detection Equipment:

Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube

Certificate show:
 Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube


Customer Visit:

Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube


Contact Us:

 Anodized Forging Cold Drawn Extrusion 2011 Aluminum Alloy Tube


FAQ:

Q1:How long time is the shortest delivery?
A1:For stock material,the delivery time is just 3-5 working days.
      And for customized product,it will takes 25-35 working days based on different size and quantity.
Q2:Can you supply the sample?Does it free or not?
A2:For partial materials,we can supply the sample free(without the freight charge).
      If you want to know more details,please contact our sales online.
Q3:What's the terms of payment?
A3:We can accept T/T,100% irrevocable LC at sight,Western Union,etc,
Q4:How to ensure the quality?
A4: We can supply QC,such as MTC,SGS, UT Certificate,etc.
       Besides,we have Trade Assurance Amount from Alibaba Group.
       If our quality is unapproved,we need and will refund full payment to customers
Q4.How can we get your price ?
We need below information to quote for you:
1. Product Name
2. Standard
3. Material Grade (Chemical Composition)
4. Dimension
5. Quantity
6. The Drawing for Special Parts

Stop Valves

Stop Valves are closed by screwing a rubber gasket down onto a seat in the middle of the valve. Pros only use small versions that act as shutoff valves for fixtures such as sinks and toilets and outdoor sillcocks. Flow is inefficient because of the circuitous route the fluid (water, in most cases) has to follow. It's important to orient the valve in the right direction with the arrow (cast into the side of the valve) aligned with flow direction. That way, water flows against the bottom of the rubber gasket. If the valve is put in backward, the flow will force the gasket away from the top of the valve.

Stop Valves, Shower Stop Valve, Water Stop Valves, Brass Stop Valve

ZHEJIANG KINGSIR VALVE CO., LTD. , https://www.kingsirvalve.com