Decoration commonly used calculation methods

First, guest restaurant and water and electricity renovation content should have:

1) Paving Floor Tiles - The main material is floor tiles. The auxiliary materials are cement, yellow sand, water and glue. The price of the auxiliary material is 10/M2. The algorithm for each square of the main material is 1/(A*B), and then multiply by The price of bricks, (a lot of decoration companies have a phenomenon that refers to 11.3 block counts 12, which is unreasonable) loss is 5%.

2) The production of baseboards should have baseboards (9 PCT + 3 plywood) + baseboard lines + paint + labor prices.

3) The latex paint on the top of the wall should have the basic treatment + latex paint primer + artificial price.

4) gypsum board ceiling, according to the projected area billing: auxiliary material + labor price.

5) The door should be installed, including door and door attachments (such as hinges, hinges, door locks, door stoppers) + paint + labor

6) The production of various cabinets and partitions and decorative walls should be based on the framework + hardware installation + paint + labor.

7) Water and electricity installation: The cost is divided into three parts: auxiliary materials - line pipe, wires, etc.; main material - switches, sockets, lamps, sanitary ware, etc.; labor costs, all local standards are not the same. Hydropower installations also include kitchen bathroom equipment installations. Most of the decoration companies pre-collect fees according to the house construction area, and settle after the completion of the project.

Second, the bedroom decoration content should have:

1) laying the floor (solid wood or composite floor), should be joists (finished or finished wood) + milled wood floor + paint + artificial price, (on the ground joists on 12 PCT board plus another calculation).

2) On-site production of baseboard, baseboard (9 PCT board + 3 plywood) + baseboard line + paint + labor price.

3) The latex paint on the top of the wall should have the basic treatment + latex paint primer + artificial price.

4) The top corner line should be the price of the finished corner line + installation dressing + labor price.

5) Door and window cover production, should be the primary treatment (ribs file + blockboard) + solid wood lines shut + line posts face + paint + artificial

6) The door should be installed, including door and door attachments (such as hinges, hinges, door locks, door stoppers) + paint + labor

7) The production of fixed cabinet furniture should be a furniture base frame + hardware installation (usually fixed furniture lining materials should be selected without the need for paint, such as double-sided white, and the decoration company would like you to make the furniture paint, because The profit ratio of the paint is relatively large).

The above are the items that will appear in the master bedroom decoration and the matters that should be noted. All the sub-items include the price of the hardware and do not need to be counted separately.

Third, the kitchen bathroom renovation content should have:

Kitchen and bathroom decoration budget prices account for a relatively high proportion of the entire budget, mainly because kitchen cabinets and bathroom fixtures determine their own price levels. The kitchen and bathroom decoration content should have:

1) Paving tiles are the same as above, because of the small kitchen bathroom floor tiles, the relative cost per square meter is much less than the restaurant.

2) laying wall tiles ---- the same as the use of secondary materials, the price of materials is 10/M2, the main material price calculation method is the same as above, do pay attention to the laying of floor tiles in addition to special reasons, generally should not appear floor Leveling this item, the cost of wall surface treatment should not occur when laying wall tiles.

3) The production of cabinets - if the budget is not recommended It is recommended that the cabinet frames be decorated on-site by the decoration worker. The owner will customize the door panels and countertops. The price of the cabinet frame stock is 190/150 (the lower cabinet/upper cabinet uses medium-density double-sided white) The labor price is 66/78, and the price of imported fireproof door panels in the market is usually 125/M2, so you can roughly estimate your own cabinet price.

4) Ceiling --- It is recommended to use the aluminum buckle ceiling with relatively high cost performance, usually the main material price is around 80/M2, and the auxiliary material price is 35/M2. This includes the price of the keel wood, usually the decoration company will These two separate calculations to increase profits.

These are the items that will appear in the kitchen and bathroom renovation and the items that should be noted. All sub-items include the price of the hardware and do not need to be counted separately.

Half of the home is home, after the renovation company's life is over, the road to the house renovation has not yet been completed, and then you should buy the furniture, fabrics, crafts, electrical equipment of each room, which is also a big investment, so in advance To investigate, plus the above investment, is the money spent on the entire decoration.

Calculation Formula Paint Door Price Furniture Latex Paint House Kitchen Cabinets Main Bedroom Renovation Plaster Ceiling Ceiling Price Decoration Find Decoration Company Okay Decoration Partition Floor Tiles Kitchen Cabinet Doors Kitchen Ceilings Ceiling Cabinets Floor Tiles Cupboard Doors Kitchen Wall Tiles Kitchen Doors Doors Doors Home Crafts Kitchen Bathroom Ceiling Bathroom Doors Bathroom Ceiling Material Bathroom Wall Tiles Toilet Partitions Bathroom Ceiling Tiles Bedroom Lamps Restaurant Furniture Restaurant Ceilings Bedroom Decoration Home Bedroom Lamps