Summer decoration knowledge entrance decoration children's room decoration paint cement coating interior decoration home decoration decoration decoration company please? floor tile tile adhesive floor tile balcony tile Flush Doors,Wooden Flush Door,Pvc Flush Door,Flush Sliding Door Foshan QI'AN Fireproof Shutter Doors Co., Ltd , https://www.qianfiredoors.com
Choose your team carefully
In the summer of this more sensitive season to engage in decoration, formal decoration company is particularly important, the above mentioned only formal companies will be able to think. In addition to looking at the qualification certificates and business licenses of the decoration companies, consumers should also look into the locations of the decoration staff and ask them what they have done in order to have the company “seal†the project and then subcontract the “guerrillaâ€. sample project.
Tiles as much as possible bubble
In summer, because the material is drier than normal, materials that need to be treated with foam water, such as floor tiles and ceramic tiles, need to be treated for a prolonged period of time so that the moisture content is close to saturation. In this way, there will be no water absorption from the cement due to the drying of the tiles during the bonding process, so that the bonding with the cement is not firm, and emptying or falling-off occurs, causing some unnecessary trouble for you.
Keep the wall dry
To do wall decoration, the drying treatment of the primary putty is particularly important, in particular, before sticking tiles, floor tiles, and wall surfaces, we must not allow the underlying layer to be too dry. Generally, we should pour water before processing to allow it to absorb about half an hour. The cement mortar or gypsum powder is primed to ensure the firmness of the paste. Summer paint dries slowly, and the paint absorbs moisture from the air and creates a layer of matte. The best thing is to use a drying agent to make the paint dry faster. Summer decoration will also encounter latex paint because of slow drying, moldy smell in hot and humid weather. In the project, it is necessary to do a good job of drying the primary putty. The walls must be fully coated with putty for three to four times before painting. After each putty, the drying time should be as long as possible, be well ventilated, reduce indoor moisture as much as possible, and avoid large area cracking.
Material avoids moisture
In summer, the air humidity is high. Some moisture-absorbing materials such as wood, board, and gypsum board are handled improperly during transportation or storage, and are prone to dampness. The wetted boards will produce moldy spots.
If wooden keels and wooden devices made of sheet material are gradually dried in the air and the moisture in the materials is volatilized, they will also easily crack and deform, and will also affect other materials. Such as the use of sheet metal gypsum ceiling, because the shrinkage factor of the plate is larger than the gypsum, wooden keel setting will directly lead to the cracking of the gypsum ceiling, which can easily affect the quality of the decoration. To avoid moisture in the material, place the material in a ventilated, dry place away from windows and water.
In the summer decoration, attention should be paid to the standardization of circuit construction operations, especially in places where balconies and other places are prone to rain, and it is necessary to wrap copper wires exposed on the outside of the wires to prevent the wires from being short-circuited after being exposed to moisture. For the wires that surround the damp wood keels and joinery, this should be taken into account. If it is not careful, it is likely to cause fire.
Painter don't rush
In summer brushing oil, wall paints are prone to yellowing and peeling. Paints are prone to whitening and bubbles. These phenomena are caused by the dry and high humidity in the summer.
In the wall base treatment, the ordinary putty can be changed into a waterproof putty, so that the adhesive between the paint and the base layer is stronger, it is not easy to fall off, and at the same time, the yellowing of the wall caused by the humidity can be avoided. In addition, pay attention to the number of scrapes and drying time when scraping the putty. Usually takes 1-3 times, during which the normal dry time is 1-2 days. However, in the rainy days when puttying, use a dry cloth to wipe off the wall vapour to keep the wall dry as much as possible. In addition, putty is a project that requires a drying process. PuTTY does not dry out and will directly affect the subsequent painting of the coating. Therefore, it is also necessary to pay attention when arranging the construction period. Do not arrange this project too late. Grab the construction period and make this project sloppy and endless troubles.
Wooden floor expansion joints
When paving solid wood flooring, it is necessary to have a good grasp of the inch, to leave a certain expansion coefficient for the solid wood floor, the floor gap is too large or too small can affect the effect of the pavement, the floor gap is too dense, after the wood floor damp expansion, will occur Deformation of the arch.
Pay attention to maintenance after completion
The cement floor, 107 plastic floor, or cement roof that has been completed, should be maintained with water every day for 35 days to prevent cracking. If cement has just wet the floor, be sure to dry it before laying the floor. Before construction, all products should be read in detail, such as instructions for chemical products such as glues, adhesives, paints, etc., must be constructed under the temperature and environment stated in the manual to ensure the stability of chemical product quality. After the renovation, you will also encounter various problems that cannot spread out and affect people's health. It is recommended to put a few pots of green plants, to use photosynthesis to remove odors, or to put a few lemons and pineapples in the house to quickly remove odors.
Summer decoration notes
In the summer, due to frequent extreme weather phenomena such as excessively high temperature, too dry weather, excessive rain, and excessively humid weather, it has never been considered a good season for home improvement. In fact, the summer construction only needs to pay attention to some important issues and also avoid quality problems.