At present, there are generally three kinds of ground leveling methods, machine grinding plus plaster leveling, cement mortar leveling, and self leveling and leveling. |.cn (5458904) Machine grinding plus plaster leveling: Cement mortar leveling: Self leveling leveling: Construction Conditions: Del floor nature floor cement room floor tile bathroom floor tile Pp Plastic Plywood,Pp Plastic Sheets,Moisture-Resistant Plywood,Versatile Construction Plywood RILICO , https://www.rilico.com
1. Do not increase the ground
2. Walk 2 hours after construction (work)
3. The construction can be wooden flooring in 3 days
4. The construction is fast (only one day per household) and the price is affordable, which is much more favorable than cement leveling and self-leveling. |.cn (5458904)
1. Increase ground minimum 2 cm
2. It can be stepped on (construction) for 3 days after construction
3. After the construction is completed, wait at least 15 days after laying the wood floor
4. Moderate price
1. Go to the highest point of the room
2. Cannot enter people after construction for 24 hours
3. After construction, almost 15 days after the cement is to be applied to the wood floor.
4. The highest price
1. Machine grinding plus plaster leveling: Construction can be done at any time (preferably after the wall and floor tiles of the kitchen and bathroom are finished).
2. Cement leveling and self-leveling Leveling: It must be done after the kitchen and bathroom tiles have been finished and between the walls.